Global Custom Market Research Reports Provider Company

phone

GoKP – Koto Hydroelectric Power Plant 40.8 MW – Khyber Pakhtunkhwa - Project Profile

  • Published Date: 30 Sep 2017
  • Number of Pages: 8
  • Category: Construction
  • Country: Pakistan

Synopsis


"GoKP Koto Hydroelectric Power Plant 40.8 MW Khyber Pakhtunkhwa - Project Profile" contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contacts.

The "GoKP Koto Hydroelectric Power Plant 40.8 MW Khyber Pakhtunkhwa - Project Profile" is part of Timetrics database of 82,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $25 million and key contact details for project managers, owners, consultants, contractors and bidders.

Summary


Government of Khyber Pakhtunkhwa (GoKP) through development agency Pakhtunkhwa Energy Development Organization (PEDO) is undertaking the construction of Koto Hydroelectric Power Plant on Punchkora River, Koto, Lower Dir District, Khyber Pakhtunkhwa, Pakistan.

The project involves the construction of a 40.8MW hydroelectric power plant.

It includes the construction of a powerhouse, a substation, a headrace tunnel, a concrete/steel lined pressure shaft, a tailrace tunnel, mani-fold and penstock, a workshop and store building, and access roads, the installation of three vertical shaft synchronous generators each of 16MVA, and the laying of the transmission lines and related facilities.

The project received the approval from the Khyber-Pakhtunkhwa government. Sarhad Hydel Development Organization has been appointed as study contractor.

The funding for the project will be secured from the federal government which has signed a loan agreement with the Asian Development Bank.

In December 2012, feasibility studies on the project were completed. In August 2013, project received approval from the federal government of Pakistan.

In September 2014, GoKP invited the tenders for the EPC contractor with the submission due date on September 18, 2014.

On October 31, 2014, the financial bids for the project were opened.

On January 2015, the EPC contract was awarded to the joint venture of M/s Sichuan Geological Engineering Complex China, M/s Sarwar & Co Pvt. Ltd Pakistan, M/s Silian Technical Import & Export Co. Ltd Chongqing China & M/s Chongqing Luyang Engineering Design Co. Ltd China (M/s Sichuan-Sarwar-Silian-Chongqing JV).

In July 2015, construction works commenced and are underway with scheduled completion by December 2018.

Scope


The project involves the construction of 40.8MW hydroelectric power plant on Punchkora River, Koto, Lower Dir District.

The US$131 million project includes the following:

1. Construction of a powerhouse

2. Construction of a substation

3. Construction of a headrace tunnel

4. Construction of a concrete/steel lined pressure shaft

5. Construction of concrete lined Surge Shaft

6. Construction of a tailrace tunnel

7. Construction of mani-fold and penstock

8. Construction of a workshop and store building

9. Construction of access roads

10. Installation of three vertical shaft Synchronous generators each of 16MVA

11. Laying of the transmission lines

Reasons To Buy


Gain insight into the project.

Monitor the latest project developments.

Identify key project contacts.

Publisher Name : Timetric

1.Key Statistics
2.Key Dates
3.Sector
4.Operating metrics
5.Tender Information
6.Scope
7.Description
8.Latest update
9.Background
10.Key Contacts
11.General News, Project News
12.Appendix



Synopsis GoKP Karak Oil Refinery Pakistan - Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership and

View Report

Synopsis GoKP Koto Hydroelectric Power Plant 40.8 MW Khyber Pakhtunkhwa - Project Profile contains information on the scope of the project including project overview and location. The profile also

View Report
There is no reviews available for this report

Select License Type

Delivery Details

Delivery Details : Electronic files (PDF) of market research reports will dispatched within 12 to 24 hours. (Mon-Fri IST)

Customized Report

If a particular report is not as per your requirement you can ‎choose "Customized Report". To visit click on -

Custom Research Reports